TUBULADORA

TUBULADORA

No disponible 🛈

Sobre demanda

Unidad(es)


24 h Delivery

With a 24 h delivery, we send you the available products within one day. Just select products with the 24 h symbol.
Please note that for this option you will be charged additional costs.

Partial delivery

With a partial delivery, we will send you the available products within a few days. Just select the products that you want to have immediately.
Please note that for this option you will be charged additional shipment costs.

Further services

Stock-keeping Package

Stock-keeping Package

Minimize downtimes with a tailor-made stock-keeping Package

Discover now

Upgrades

Upgrades

Maintain or optimize the productivity of your existing systems in the long term

Discover now

Substitution lists

Substitution lists

Get a free overview of all replaced materials that are installed in your system

Discover now

Last viewed

  • Power supply unit
  • Belt
  • Curved Conveyor Section Group List
  • mounting angle 90 grad
  • Cable vevice
  • Vent tube
  • Power supply
  • Pressure gauge
  • Ethernet modul
  • Panel
  • Straight pin
  • Cap screw
  • COOLING DEVICE
  • Countercurrent heat exchanger 5,5 m2
  • Flange bearing PCJ N 50/43.7x143
  • Conveyor roller  L=640
  • ARTICULATION
  • Motoréd. à vis sans fin 0,55kW 54 1/min
  • Disjoncteur 4A 3 1p
  • BALAI CONDUCTEUR
  • PLAQUE D'EXTREMITE
  • Objectif f=50mm
  • Objectif f=12,5-75mm 2/3pouces
  • Hydraulic nut
  • Potentiometer SP120-G-MF 400 mm
Chatbot
close close