SHRINK TUBING

SHRINK TUBING

On request 🛈

Price on request

meters


24 h Delivery

With a 24 h delivery, we send you the available products within one day. Just select products with the 24 h symbol.
Please note that for this option you will be charged additional costs.

Partial delivery

With a partial delivery, we will send you the available products within a few days. Just select the products that you want to have immediately.
Please note that for this option you will be charged additional shipment costs.

Further services

Stock-keeping Package

Stock-keeping Package

Minimize downtimes with a tailor-made stock-keeping Package

Discover now

Upgrades

Upgrades

Maintain or optimize the productivity of your existing systems in the long term

Discover now

Substitution lists

Substitution lists

Get a free overview of all replaced materials that are installed in your system

Discover now

先前已看

  • Shaft
  • SEAL/GASKET
  • CONNECTION/LINK
  • Transfer Module
  • Cable
  • Spatula
  • RETAINING RING
  • Pressure spring
  • 安装
  • 过渡导向装置
  • 自动保险装置
  • 传感器
  • Y 形快插接头
  • 容器排除装置
  • 控制装置
  • 万向接头
  • 6KT 螺栓 M20x80 8.8 ISO4017-ZnNi/T2/720h
  • 滚珠
  • 电缆拖链
  • 磁铁
  • 配件
  • 气缸螺栓 M4x12 DIN84-ZnNi/T2/720h
  • 盲盖 DN100 CNS DIN11851
  • 张紧部件
  • 轴承套
Chatbot
close close